Modal title
Modal body text goes here.
Log In
Anna Maria (SR 64/Manatee Ave. West) Bridge
- Mile Marker: 89.2
- Lat / Lon: N 27° 29.800' / W 082° 41.690'
- Bridge Type: Bascule
- Vertical Clearance (Closed): 24.00 ft.
- Horizontal Clearance: 90.00 ft.
- Schedule:
The draw of the Anna Maria (SR 64) (Manatee Avenue West) Bridge, mile 89.2, at Bradenton Beach, Florida shall open on signal, except that from 6 a.m. to 7 p.m. daily, the draw need only open on the quarter hour and three quarter hour.
Editor's Note: Bridge schedules are subject to temporary change due to repairs, maintenance, events, etc. Check the Waterway Explorer for possible nav alerts. - VHF Channel: 9
3 Boater Comments
These are observations from the boating community. Waterway Guide information is verified regularly and all efforts will be made to validate any new updates submitted here. Thank you for taking the time to share comments about your experience.
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
Current Review Policies
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
- Comments are reviewed and/or verified by Waterway Guide staff and do not post immediately. Please use a valid email address so that we can contact you if we need clarification (email address will not be published).
- Name will be published. Anonymous comments may not be posted.
- Comments will be shared with the reviewed marina to offer them an opportunity to respond. If they choose to do so, the marina’s comments may also be posted in response to the original comment.
- Comments containing foul or obscene language will be rejected or returned for resubmission.
- Comments containing personal attacks will be rejected or returned for resubmission.
- Off-topic content will be rejected.
- Comments must describe commenter's personal experience – “hearsay” reports will be rejected.
- Comments must be understandable and clear enough to inform other boaters.
- URL links are allowed only if they inform the content – no “advertising” your business or blog.
-
Comment by: David Creek on Mar 15, 2024
Vessel Type: Power
LOA: 45'
Draft: 3.0'The clearance is posted at the sides of the arch. It is 3' higher in the center of the Bascule than the markings. We use this bridge often. Clearance is usually 22' to 24' .
View location on the Waterway Guide Explorer
-
Comment by: Larry, Savannah Blu , on Sep 21, 2022
Vessel Type: Power
LOA: 35'
Draft: 4.0'10:15 9/21/23 bridge clearance was 19'
View location on the Waterway Guide Explorer
-
Comment by: Allan Straughan on Nov 16, 2020
Vessel Type: Power
LOA: 50'
Draft: 4.0'This bridge has 20’ at most vertical clearance not 24 as advertised on this site.
-
WG Editor Comment:
The bridge is shown on the NOAA chart and is listed in Coast Pilot 5 as having a vertical clearance of 24 feet at the center.
View location on the Waterway Guide Explorer
-
WG Editor Comment: