Modal title
Modal body text goes here.
Log In
VA: Elizabeth River, Scott Creek, Pier Repair
- Date Reported: Jun 6, 2023
- Reporter: Ted Stehle
- Source: CG 5th District LNM 0523/23
- Description:
Crofton Construction Services, Incorporated (CCSI) will be performing repair of Crofton Bulkhead in Scott
Creek. Specifically, there will be installed approximately 276 linear feet of replacement steel sheet pile
bulkhead, an average 3 feet channel ward of an existing, deteriorating bulkhead withing Scotts Creek,
adjacent to property situated at 16 Harper Avenue in the City of Portsmouth. The limits of construction are
approximately .20 acres in size and the area is bound by the land on the NW and Scott Creek on the other
three sides of the bulkhead at in the following location:
36°50'54.20"N, 76°18'56.41"WBeginning June 16, 2023, and continuing until December 31, 2024, approximately 198 days or until
complete from 7:00 AM – 5:00 PM, five days a week. Operations will include crane barge operations,
material barges, tugboats, work floats, and smaller crafts consistent with general marine construction.
Barge(s) & vessel(s) will be moored, on site with employees working over the side on small floats or crew
boats. The construction equipment will be confined to the barges with crew boats working in the vicinity.
The entire channel will not be closed, during any stage of construction, or will not restrict marine traffic.
Vessels are requested to proceed in this area with caution and no wake within 500' of the above
coordinates. Crews will be monitoring the following radio frequencies: VHF channels 13 & 16. - Lat / Lon: N 36° 50.903' / W 076° 18.912'
Be the first to provide comments about this navigation alert
These are observations from the boating community. Waterway Guide information is verified regularly and all efforts will be made to validate any new updates submitted here. Thank you for taking the time to share comments about your experience.
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
Current Review Policies
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
- Comments are reviewed and/or verified by Waterway Guide staff and do not post immediately. Please use a valid email address so that we can contact you if we need clarification (email address will not be published).
- Name will be published. Anonymous comments may not be posted.
- Comments will be shared with the reviewed marina to offer them an opportunity to respond. If they choose to do so, the marina’s comments may also be posted in response to the original comment.
- Comments containing foul or obscene language will be rejected or returned for resubmission.
- Comments containing personal attacks will be rejected or returned for resubmission.
- Off-topic content will be rejected.
- Comments must describe commenter's personal experience – “hearsay” reports will be rejected.
- Comments must be understandable and clear enough to inform other boaters.
- URL links are allowed only if they inform the content – no “advertising” your business or blog.