Reviews from George Adamczyk (1)

  • Bridge comment on Blackburn Point Swing Bridge

    Comment by: George Adamczyk, Chances Are, on Nov 5, 2016
    LOA: 30'

    Bridge opens 8am and every 4 hrs.

    • WG Editor Comment:

      This is due to repairs being made on the bridge. See the nav alert posted.

    View location on the Waterway Guide Explorer