Reviews from Len (1)

  • Bridge comment on Norfolk Southern #7 Railroad Bridge

    Comment by: Len on Jun 12, 2019
    Vessel Type: Power
    LOA: 26'

    I've been stuck with this bridge closed for extended periods twice in the last two weeks. One of those delays was over 90 minutes. I was also stuck behind the train bridge that is closer to Norfolk during the same trip. It appears there is an issue with traffic and the train bridges that needs some attention in Chesapeake and Norfolk.

    View location on the Waterway Guide Explorer