Modal title
Modal body text goes here.
Log In
Sarah M. Long Bridge
- Mile Marker: 2.5
- Lat / Lon: N 43° 05.174' / W 070° 45.640'
- Bridge Type: Movable Span
- Vertical Clearance (Closed): 56.00 ft.
- Horizontal Clearance: 70.00 ft.
- Schedule:
The draw of the Sarah M. Long (Route 1 Bypass) bridge, mile 2.5, shall open as follows: (1) The main ship channel draw shall open on signal; except that from 15 May through 31 October, from 7 a.m. to 7 p.m., the draw need be opened only at quarter of and quarter after the hour for recreational vessels and commercial vessels less than 100 gross tons except as provided in (a)(1). (2) The secondary recreation draw shall be left in the fully open position from 15 May through 31 October except for the crossing of a train in accordance with (a)(3) above. (3) Trains and locomotives shall be controlled so that any delay in opening the draw shall not exceed five minutes. However, if a train moving toward the bridge has crossed the home signal for the bridge before the signal requesting opening of the bridge is given, that train may continue across the bridge and must clear the bridge interlocks before stopping.
Editor's Note: Bridge schedules are subject to temporary change due to repairs, maintenance, events, etc. Check the Waterway Explorer for possible nav alerts. - VHF Channel: 13
- Comments:
Bridge is charted at 16 feet which is not correct.
1 Boater Comment
These are observations from the boating community. Waterway Guide information is verified regularly and all efforts will be made to validate any new updates submitted here. Thank you for taking the time to share comments about your experience.
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
Current Review Policies
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
- Comments are reviewed and/or verified by Waterway Guide staff and do not post immediately. Please use a valid email address so that we can contact you if we need clarification (email address will not be published).
- Name will be published. Anonymous comments may not be posted.
- Comments will be shared with the reviewed marina to offer them an opportunity to respond. If they choose to do so, the marina’s comments may also be posted in response to the original comment.
- Comments containing foul or obscene language will be rejected or returned for resubmission.
- Comments containing personal attacks will be rejected or returned for resubmission.
- Off-topic content will be rejected.
- Comments must describe commenter's personal experience – “hearsay” reports will be rejected.
- Comments must be understandable and clear enough to inform other boaters.
- URL links are allowed only if they inform the content – no “advertising” your business or blog.
-
Comment by: Bill Pelletier, Tracy Elizabeth, on Jan 18, 2023
Vessel Type: Power
LOA: 39'
Draft: 4.6'The Sarah Mildred Long Bridge was rebuilt and reopened in 2018 with significantly different operating heights for the draw. It now has a "closed" clearance of 56 feet. https://en.wikipedia.org/wiki/Sarah_Mildred_Long_Bridge
-
WG Editor Comment:
Confirmed and listing has been corrected. NOAA ENC chart still shows 16 feet.
View location on the Waterway Guide Explorer
-
WG Editor Comment: